Skip to main content
Hit enter to search or ESC to close
Close Search
WALBO SOLUTIONS
Menu
  • SERVICES
    • ROBOT PROGRAMMING
    • PLC PROGRAMMING
    • FACILITY MAINTENANCE
    • PROGRAMMING AND MANUFACTURING CONTROL PANELS
  • OUR WORK
  • ABOUT US
  • TECHNOLOGY
  • CONTACT
  • EN
    • PL
    • DE

Bratysława, Słowacja

Volkswagen

2022

Scope of works:

  • Modernisation of the control system on the final assembly line with regard to the control of EHB slings
  • Commissioning of the modernised Safety programme after hardware adaptation to the latest machine safety standards.
  • Re-integration of the EHB sling system into the chassis-body bolting station.

 

Technologies used:

  • Siemens S7-300, Sick, Atlas Copco
  • Previous ProjectTychy, Poland– Magna

  • Next ProjectTokod, Hungary– Volvo

Ready for work

Let's talk

SERVICES

OUR WORK

ABOUT US

TECHNOLOGY

Privacy Policy
© 2026. All rights reserved.

WALBO SOLUTIONS SP. Z O.O.
ADDRESS: MACHCIN 4, 64-030 MACHCIN, POLAND
NIP 6981859818
KRS 0001034305

Made by BOOST
Close Menu
  • SERVICES
    • ROBOT PROGRAMMING
    • PLC PROGRAMMING
    • FACILITY MAINTENANCE
    • PROGRAMMING AND MANUFACTURING CONTROL PANELS
  • OUR WORK
  • ABOUT US
  • TECHNOLOGY
  • CONTACT
  • EN
    • PL
    • DE